Wagon Repairs progressed and trackside tweaks

The day began in fairly pleasant conditions, though the heat built steadily and the humidity after lunch made everything feel heavier. With only a small team on site, progress still moved at a good pace and a satisfying number of jobs were cleared. Work on the Dough wagon advanced with the final filling and sanding […]

Dough rolls again and Budleigh prepares to depart

A small midweek team was on site, and the heat hit us from the moment we arrived. Painting carried on inside shed 83C, while the Dough wagon went back on the rails so the last bits of bodywork can be tackled once the lifts are moved. The generator was refuelled using the long hose straight […]

Trains and Tidying Up was the order of the day

A much better day on site today as it was sunny, bright, and warming up hour by hour. The team was small thanks to holidays and other commitments, but we still made the day count. With it being a Mills Open Day, trains were run and happy passengers carried and the operation ran smoothly throughout. […]

Scroll to top